Circle 12 Seats Teppanyaki Grill
Product Name:Circle 12 Seats Teppanyaki Grill
I.Equipment Structure:
Teppanyaki is comprised of mainframe,surrounding decoration,fumes purifier and air blower.
II.Equipment heating mode
1,Gas
Coal gas:9’Calorific Value 10000 consumption:2.92m³/h
Liquid gas:9’Calorific Value 8500 consumption:0.85kg/h
Natural gas:9’Calorific Value 10000 consumption:1.2m³/h
2,Electric heated tube
Parameter:380V/50HZ Power 7.5KW Triphase five-wire system
3,Electromagnetic plate
Parameter:380V/50HZ Power7.5KW triphase five-wire system
III.Gas Teppanyaki Direction for use
1,Turn on air blower switch to exhaust air first.
2,Turn on Gas switch, attention: do not turn on totally.
3,Set fire to burner by electronic light strike or lighted torch, adjust the gas switch to control the fire.
Mark:It maybe hard to set fire because there’s air in thepipe, just set fire continuely
IV.Electric heated tube Direction for use
1,Turn on power switch.
2,Turn on Teppanyaki Power switch, Red light signs power.
3,Make sure turn on air blower switch.
4,Adjust the temporature on the operation plate, green light signs heating.
5,Turn off all switch after using.
IVI,Electromagnetic Plate Direction for use
1,Voltage and Power:
(1)Voltage range:380V–400V.
(2)Frequency range:50HZ–60HZ.
(3)Power:8kw-12KW.
2,Operation:
Turn power switch, It stay waiting up,Turn on start swich after setting the temperature you need,The plate start been heated, When it touch your setting temporature, It will keep a 5 Celsius up or down;
Turn off start switch first when power off, Turn off power switch after 5 minitues.
Mark:If you turn off power switch before start switch, You should put the start switch to the turn off position, when next time.
3,Protection:It enter waiting up situation if 2 hours not be used, If you want use now, Reset the start switch.
4,Temporature setting:The temporature can be set set by you, The temporaturerange is 0-400 Celsius, method is as follow:
Enter:press circle point key(0.5) temporature, enter temporature menue on temporature operation plate, Least significant digit on SV window starts to bicker.
Alteration:press< key to move the digit to left, press up key to alter the temperature up,press down key to let temporature down. Keep pressing up key,let temperature up continuity,keep pressing down key set temporature down continuity.
Exit:when aftering use,press circle point key for 0.5 second.
Attention:
1,Do not press so hard when using.
2,Pay attention to prevent water when clearing.
IVII,The install method for surrounding decoration(marble):
1,Fix the position of marble stall.
2,Carry marble according the heavy of them.
3,Put marble on the bracket, put the non-edging side to the plate surrounding trim strip.
5,Use glue to fox all joint line.
6,Clean the marble before solidify.
IVV.The Teppanyaki plate clean way
1,The temporature will be down to after using,put some oil to the plate, use scouring pad(The green pad which I send to you) to scrape, It’ll be clean and shine.
2,Glazed salad oil on it after cleaning.
3,Clean the slad drawer every day.
4,Unscrew the four screw bolt on the chef side(rectangle one),pull out filter, use leanerto wash the filter, dry it and put back, one time every three month.
5,Put out the oil collect drawer,drop the fumes oil, and wash it, Then put back.
Attention:You must put oil on the plate when you do not use it.
IVVI.Clean method of fumes purifier
1,Use the purifier door key to open the door, then you can see the electric case.
2,Make sure the power switch been Turn off.
3,Use screw driver to unscrew the fixed screw on the pole plate.
4,Pull out the filter and pole plate, do not pull so hard to destroy the component .
5,Inject water to the container which has been put leaner.
6,Put pole plate to the container to wish, about 10 minitues.
7,Dry it.
8,Use cotton clothto scrup and clean sundries such as oil extraction.
9,Install it back, and close the door.
Attention:Do not open the purifier when The electric power is on.
IVVII,Install of ElectricEquipment:
1,Unscrew thescrews on the temperature contral plate, dismount the face-plate.(picture 1).
2,Put the power wire in.
3,According to picture 2,contect L1,L2,L3,N line and grounding line.
4,Get through electric power, use special sleeve to protect the wire joint.
5,Install the face-plate, and turn on the main switch.
Circle 12 Seats Teppanyaki Grill